old-Taichung trellis type 72.6kwp

Maintenance performance

Taichung Scaffolding Type

72.6 kWp
Structure and Support
Check the external corrugated board Check whether the cement base is cracked Check whether the module bracket is loose or corroded
Solar photovoltaic module
Check whether the module is damaged. Check whether the module has obvious abnormal pollution. Check whether the module frame is corroded. Damaged Ground Continuity Measurement*Spot Test
AC switchboard
Check the appearance of the main body and the fixed frame for corrosion Whether the electrical appliance has scorch marks or burnt phenomenon Check whether the circuit breaker is working properly Insulation resistance measurement of each phase of three-phase power (inverter comes with inspection) Grounding resistance measurement Grounding continuity measurement Check whether each contact is loose or oxidized Phenomenon
Share by: